Assembly instructions for the installation of the cable

1. Planning of cable route


Start by planning the exact route of the cable. This is crucial for the optimum function and longevity of the installation.

2. Check the specification


Check whether the specification of the cable matches your desired application.

3. Laying out the cable


Lay the cable in a straight line on the floor. It is best to use a cable dispenser to make handling easier.
Make sure that the cable is not twisted.

4. Mounting the plug


Fit the plug at the end of the cable if it is not already attached.

5. Examination of the chamber


Before inserting the cable into the PIT system, check the chamber for damage and sharp-edged components

6. Introducing the cable


Insert the unassembled end of the cable into the PIT system without forcing or twisting it.

7. Condition of guide rollers


Ensure that the guide rollers are in good condition and can be moved easily.

8. Inserting the cable


Before connecting the cable, make sure that the cable is inserted as shown in the schematic diagram.

With the GP 400 SF cable, the cable must be inserted anti-clockwise due to the direction of lay. This is important in order to be able to attach the cable clamps in the correct position.

9. Fitting the cable clamps


When attaching the cable clamps, make sure that the cable is fastened without constraint or twisting.

10. Connection to switch box


Connect the cable to the switch box.

11. Final check


After connecting the cable, pull it out once along its entire length and reinsert it to ensure that everything is installed correctly.After connecting the cable, pull it out once along its entire length and reinsert it to ensure that everything is installed correctly.

Highly flexible cables according to your special requirements

Family business for construction and production since 1947

Please send us your inquiry
+49 (0)2162 898-0
Monday to Thursday, 7.30–16.30
Friday, 07.30–13.30